airport sea road icon

  515 Acres

North Port Innovation Corridor in North Port, Florida is perfect for companies looking to locate in an area with a large workforce and a sizable manufacturing base in southwest Florida. The park provides 515 acres ready for development and flexible zoning allows for 600K square feet of light industrial development and 800K square feet of office space.

 

 

 

Infrastructure

The North Port Innovation Corridor provides easy access to markets across the state and around the world. There is a mile of prime frontage to Interstate 75 at the site, and SeaPort Manatee and Sarasota-Bradenton International Airport are both about 50 miles away. The site is served by an FPL 230 kV Transmission Line. 

Incentives

Florida is considered one of the best states to do business. Labor costs are low, regulations are limited, and the state has no state income tax. Additional benefits to owning a business in Florida:

  • No state personal income tax
  • No state-level property tax assessed
  • No property tax on business incentives
  • No sales tax on manufacturing machinery and equipment
  • No property tax on goods-in-transit for up to 180 days
  • No sales and use tax on goods manufactured or produced in Florida for export outside the state
  • CITC is an annual credit against the corporate income tax, and is used to attract and grow capital-intensive industries in Florida
  • ·Rapid Permitting
  • Ad Valorem Tax Exemption
  • Mobility Fee Mitigation
  • Special Meeting Incentive

Quality of Place

When people dream about lounging on a beach in perfect weather, they’re dreaming about Sarasota County. It’s a place filled with sunshine and year-long outdoor activities. Beautiful weather and white sand beaches, Sarasota County is a magical place for those who love to feel the sunshine on their faces. Florida’s West Coast is perfect for life outdoors. Yes, the summers are warm, but our beaches are beautiful and our winter months are picturesque. With an average 255 days of sunshine a year, you’ll find that your lifestyle spills effortlessly into outdoor spaces, all year long.

Site Readiness

Acreage 515
County Sarasota
City North Port
Latitude/Longitude 27.10393698882759, -82.1555807313478
Airport Sarasota-Bradenton International Airport
Port SeaPort Manatee
Interstate/Highway I-75
Electric Served by FPL, a substation is located 1.5 miles west of the site; a 23 kV distribution line will serve the site; a 230 kV transmission line runs parallel to the site
Water Manatee County will provide water service to the site through a 60 psig 12” main 200 ft from the site
Natural Gas The site is served by TECO through a 10” distribution line  approximately 1 mile from the site
Wastewater Manatee County will provide wastewater service to the site
Telecommunications Site is served by Spectrum; fiber optic is available
north port innovation corridor

Research Resources

Ready to make a move?

Let's talk! We can help you with sites and buildings or confidential site selection, electric rates and infrastructure assessments, community data and more. Put our decades of experience as one of the largest employers in Florida to work for your company.

Reach out to Aaron Michael.
561-797-9005 Aaron.Michael@fpl.com

fpl powering florida logo